Data Center & Colocation Hosting in Utah
Flexible pricing models with up to 14MW capacity and off-peak optimization
Utah introduces a level of power management sophistication uncommon in the mining hosting market. The Clearfield facility offers operators a clear choice: run at 100% uptime for maximum hash rate, or shift to 80% off-peak operation and cut energy costs nearly in half. With 14MW of dual-feed capacity and a dry, high-altitude climate that naturally assists air cooling, Utah rewards operators who bring strategic thinking to their energy procurement.
Infrastructure Overview
Utah offers sophisticated power management options with up to 14MW of capacity at the Clearfield facility. Operators can choose between 100% uptime at approximately 9.5-10 cents per kWh or optimize costs with 80% off-peak operation at 5.5-6.2 cents. This flexibility makes Utah ideal for miners with advanced power management strategies.
Western Interconnection grid with diverse energy mix including solar, wind, and natural gas. Dry climate is ideal for air-cooled mining operations. Business-friendly state with strong data center industry presence.
Mining Farm Opportunities
Lease or purchase turnkey mining facilities in Utah.
Clearfield, UT (14MW)
100% uptime at ~9.5-10 cents OR 80% off-peak at ~5.5-6.2 cents. Flexible power management.
Why Utah?
Flexible Pricing
Choose your power model: 100% uptime for maximum hash rate, or 80% off-peak operation for the lowest possible per-kWh cost.
14MW Scale
Major capacity available across two dedicated power feeds (7.5MW + 6.5MW) for large-scale operations.
Dry Climate
The arid Utah climate is ideal for air-cooled mining operations, reducing infrastructure complexity and costs.
Frequently Asked Questions
Explore Other Locations
Ready to Deploy in Utah?
Book a free 20-minute consultation to discuss capacity, pricing, and deployment timelines.