Cooling Cost Calculator
Estimate the energy and cost overhead of cooling your compute deployment. Compare air, liquid, and immersion cooling approaches.
Results
Total Facility Load (kW)
--
Cooling Overhead (kW)
--
Cooling Monthly Cost
--
Cooling Annual Cost
--
Total Monthly Power Cost (IT + Cooling)
--
Annual Savings vs. Air Cooling (PUE 1.25)
--
Methodology
Total facility load = IT_load * PUE. Cooling overhead = total_facility_load - IT_load. Cooling monthly cost = cooling_overhead_kW * 24 * 30.44 * electricity_rate. Total monthly power = total_facility_load * 24 * 30.44 * electricity_rate. Baseline (air PUE 1.25) annual cost = IT_load * 1.25 * 24 * 365 * electricity_rate. Current annual cost = IT_load * PUE * 24 * 365 * electricity_rate. Savings = baseline_annual - current_annual.
Ready to Start Your Operation?
Contact our team for custom calculations and deployment planning.